Desalination plant upgrades · Canary Islands

Desalination Plant Renewal Plan in the Canary Islands

Restore performance, reduce energy use and prepare your plant for reliable production. We assess what to retain, replace or upgrade in each reverse osmosis system.

For industry, hotels, agriculture, residential communities and public infrastructure.

Data-led assessmentFlow, water quality, energy and equipment condition.
Targeted upgradesRetain what still performs well.
Measurable efficiencyTechnical comparison before and after.
Operational continuityPlanned work and ongoing support.

A plant with more to offer

A sound upgrade starts with understanding the existing plant.

HidroSoluciones Canarias’ desalination plant renewal programme serves seawater and brackish-water facilities that need to restore output, control costs or reduce failures. An older plant may still have valuable components; in other cases, new technology may justify replacing an entire treatment train.

We review water quality, intake conditions, specific energy use in kWh/m³, recovery rate, membrane, pump and control-panel condition, and target water quality. These data support an upgrade matched to actual demand without assuming every component needs replacement.

The technical choice: refurbish, expand or replace. We compare investment, potential savings, service continuity and maintenance needs.
01 / WATEROutput and target water quality
02 / ENERGYEnergy use and recovery
03 / CONDITIONMembranes, pumps and controls
04 / SERVICEDowntime and spare parts
High-pressure pump with motor in front of aligned membrane housings in an industrial reverse osmosis system
High-pressure pump and membrane housings. In older plants, the reject may leave without energy recovery.

Installation audit

Before proposing equipment, we measure the problem.

A drop in flow rate is not always solved by replacing membranes. It can result from pretreatment, available pressure, scaling, fouling, pumps operating outside their design point or changing demand.

  • Feed, permeate and rejection analytics; pressure, flow rate and conductivity trend.
  • Electricity consumption, working hours and energy per cubic metre actually produced.
  • Status of pre-filters, membranes, CIP systems and chemical dosing.
  • High-pressure pumping, energy recovery where applicable, instrumentation and automation.
  • Space, access, hydraulic connections and the possibility of carrying out the work in phases.
Tell us what is happening at your plant

What the Renove Plan can include

Technical modernisation, from pretreatment to control.

The scope is defined after inspecting the plant. These are the usual interventions in an industrial reverse osmosis desalination plant refurbishment.

01 / PROTECTION

Pretreatment and chemistry

Filtration, fouling control, antiscalant dosing and feedwater conditioning to protect membranes and components.

02 / ENERGY

Pumps and recovery

Review of the duty point, motors and drives. In seawater, we study isobaric energy recovery devices when the design and flow rate justify it.

03 / MEMBRANES

Reverse osmosis

Performance evaluation, membrane selection, membrane housings and stage configuration for the required quality and production.

04 / OPERATION

Control and instrumentation

Flow, pressure and conductivity measurements, automation, alarms and supervision to operate with reliable data.

05 / CONTINUITY

Cleaning and spare parts

Review of CIP, flushing, consumables availability and preventive and corrective maintenance plan.

06 / INTEGRATION

Post-treatment and network

Remineralisation where appropriate, storage, valves and connections to the existing infrastructure.

Old desalination plant versus modernised one

Improvement is measured in the operation, not in a universal figure.

The result depends on the feed water, the scale of the plant, the existing equipment and the scope of the renovation. A useful comparison uses the same criteria before and after.

Initial situation

  • Actual production and quality of the water obtained.
  • kWh consumed per m³ of permeate.
  • Recovery, pressures and recorded stops.
  • Maintenance costs and spare parts availability.
  • Automation and operation limitations.

Aim of the intervention

  • Flow rate and quality adjusted to the end use.
  • Lower specific energy when the project permits.
  • Greater stability and early detection of deviations.
  • Schedulable maintenance and accessible components.
  • Investment justified against the expected lifespan.

Not all plants require an energy recovery device or achieve the same savings; solutions for seawater and brackish water are studied separately.

Energy saving simulation

A clear example, with the hypotheses in plain view.

If a plant produced 1,000 m³ daily for 350 days a year and its specific consumption fell from 4.5 to 2.5 kWh/m³, the difference would be 2,000 kWh per day of operation.

Assuming a hypothetical tariff of €0.11/kWh, the calculation would yield an annual energy cost reduction of €77,000. The investment, maintenance costs and return are analysed separately.

1.000m³/day of assumed production
4.5 → 2.5Hypothetical kWh/m³ before and after
700.000kWh/year of calculated difference
77.000 €per year, with electricity at €0.11/kWh

A thorough decision

Photovoltaics, investment and lifespan.

The hydraulic and energy improvement can be combined with other decisions, provided the site and the figures support them.

Solar photovoltaic self-consumption

We study the compatibility of solar production with the plant schedule, electrical demand, available space, and water storage strategy. Photovoltaics can reduce energy purchased from the grid, but do not by themselves modify the specific consumption of the reverse osmosis process.

Learn about modular solutions

Funding and return

We present investment and operating costs separately to assess partial replacement, comprehensive refurbishment or phased implementation. If of interest, we can look into options such as leasing or renting depending on the funder's availability and the project conditions. We do not quote grants or payback periods without verifying each case.

View our desalination plants

Workflow

From the existing installation to an actionable decision.

01 / LISTEN

Initial review

You tell us about production, incidents, analytics and available consumption data.

02 / DIAGNOSE

Visit and measurements

We define whether inspection, data collection or testing are required and agree on their scope.

03 / COMPARE

Technical alternatives

We contrast rehabilitation, substitution and intervention phases with investment and operation.

04 / IMPLEMENT

Execution and monitoring

We plan the commissioning and maintenance according to the continuity required by the client.

The initial assessment of the documentation provided is without obligation. An on-site audit, measurements or testing are defined and quoted according to the required scope.

Closeness and reach

Modernisation of desalination plants across all islands.

With offices in Tenerife and Gran Canaria, we coordinate projects for hotels, industry, agriculture, property owners' associations and the public sector. Logistics, access to spare parts and continuity of supply are all part of the proposition.

We work with both seawater and brackish water plants. For installations that need to preserve a large part of their equipment, we also offer maintenance and spare parts for desalination plants.

Coverage in the Canary Islands

TenerifeGran CanariaLanzaroteFuerteventuraLa PalmaLa GomeraEl HierroLa Graciosa

Visits and distribution are organised according to the technical scope and location of each facility.

Frequently asked questions

What you need to know before renewing.

A serious proposal starts with operational data and measurable objectives.

Does the whole desalination plant need to be replaced?

Not necessarily. The structure, the equipment and their integration are evaluated to decide whether it is advisable to modernise components, replace a train or design a new plant.

Can a desalination plant be refurbished without interrupting the supply?

It depends on the installation. We study phases, redundancy, storage and potential bypasses to plan the work and reduce downtime, without promising absolute continuity without inspecting the plant.

What energy savings can be achieved?

The estimate is obtained by comparing consumption measured in kWh/m³, output, water quality and capital costs. The figure for a seawater plant must not be extrapolated to a brackish water one.

Does it include energy recovery ventilators and solar panels?

These are different technical options. Energy recovery can be useful in certain seawater plants; photovoltaics are assessed separately according to electricity demand, surface area and operational pattern.

Can you study leasing or renting?

Yes, depending on the amount, ownership and conditions offered by the financial institutions. Alternatives are compared without presenting financing or a subsidy as guaranteed.

Let’s discuss your desalination plant

What can improve your desalination plant?

Send us the flow rate, available water analysis, power consumption and operational issues. We will prepare the next steps for a tailored technical assessment.

Request a technical assessment